
You want room on every side of the house.
You've had this in mind for a while: a few acres in West Lakeland, with ponds and wetlands between the streets and open land outside the windows. Our part is getting the house permitted and built on the land you choose.
Life here
West Lakeland feels like the country, with Lake Elmo on one side and the St. Croix on the other. It started as the farm side of Lakeland. In 1950 its farmers asked Washington County to make them their own township, because the river town was deciding how their road money got spent. Small farms held on here into the 1960s. Today the township is mostly homes on large lots along curved paved streets, with wetlands and ponds between the neighborhoods and rougher hills up at Christmas Tree Ridge.
One public school district, Stillwater Area Public Schools, serves all of West Lakeland. Interstate 94 runs along the township's southern edge, and every public road in the township is paved.
There are no public parks inside the township, because the big lots serve as the open space. Lake Elmo Park Reserve and Afton State Park are both close, and part of the Bayport Wildlife Management Area reaches into the township along County Road 24. The township's plan expects only about 80 new households through 2040, so new lots don't come up often.
What we check on a West Lakeland lot
Most of what you'll love about a West Lakeland lot is outside, and most of the rules here are about the ground and the water under it. The township runs its own zoning and building permits. Washington County handles septic and the river corridor, and the Minnesota Department of Health oversees wells. These checks come from all three, and we confirm each one for your parcel.
One contiguous buildable acre
Almost all of West Lakeland is zoned Single Family Estate, with a two-and-a-half-acre minimum lot and 160 feet of frontage on a public road. Inside that, the house needs one contiguous acre with slopes under 25 percent, outside the setbacks and out of any floodplain or drainage easement. The house sits 50 feet from the front and rear lot lines and 25 feet from the sides. A rolling lot with a wetland through it can come up short on that acre, so we map it first.
The well and the water
Groundwater is the first question in West Lakeland. PFAS from the 3M East Metro plume has been found in wells across the township, and the state's 2021 water supply plan keeps West Lakeland homes on whole-house treatment systems instead of city water. Part of the township also sits in a state well area for TCE, where the Department of Health has to approve a well plan in writing before drilling and the water has to pass a test before it's used. We find out which rules apply to your parcel and plan the treatment into the build from the start.
The 180-day exterior rule
West Lakeland requires the exterior to be finished within 180 days of the building permit. That means the finished siding, roofing and masonry. A house with stone and detailed trim that starts framing in the fall can run up against that date. We set the permit date around the schedule and talk with the building official about it before we apply.
The driveway comes first
The township won't issue a building permit for a new home until the driveway permit is issued and the grading plan is approved, and the fire chief reviews the driveway. Any stretch steeper than 6 percent has to be paved with concrete or asphalt. No part of it can be steeper than 13 percent, and the culvert at the ditch has to be steel and at least 24 feet long. A long, winding drive on a rolling lot gets designed around all of it.
Stormwater at 6,000 square feet
Once a project reaches 6,000 square feet of hard surface, West Lakeland requires its own stormwater permit, and in the Valley Branch Watershed District a district permit too. A house, an attached garage, a long driveway and a patio get there quickly. We count the hard surface during design so the stormwater plan is part of the drawings.
Barns and shops wait for the house
Accessory buildings can't be built until the house has its certificate of occupancy. They're limited to one story, and together they can cover no more than 3 percent of the parcel. If you want a shop or a barn, we design it with the house and build it after you move in.
The corner along the river
A small part of the township, in the northeast corner along the St. Croix, falls under Washington County's Lower St. Croix riverway rules instead of the township's lot rules. There, a stormwater permit is needed at 500 square feet of new hard surface. If your lot is in that corner, we pull the county's riverway rules before design gets far.
If you're still looking for land here
If you don't have land yet, you're in good company. Listings in the township usually say Stillwater or Lake Elmo, but the rules come from West Lakeland, and the town hall keeps morning hours by appointment. Lori runs Royal Home Team, and she and her team help people find land here. She'll want to know how you plan to use the yard before she starts looking.
If you need to sell first
If you own a home now, Royal Home Team can sell it, and we'll work through the timing with you before it's listed.
Questions about building in West Lakeland
Can we rent the house out short term?
Not in the Single Family Estate district. Rentals of 180 days or less are prohibited there, and a property can't be rented more than twice in a rolling year. If a short-term rental is part of your plan, it won't work in most of the township.
Which school district is West Lakeland in?
The whole township is in Stillwater Area Public Schools, ISD 834. We confirm it on the county record for your parcel.
How common is PFAS in West Lakeland wells?
Common. Since 2003 the state has sampled 1,389 wells in the township and issued advisories on 704 of them. The township stays on whole-house treatment systems instead of city water. We test the new well as soon as it's drilled, and the state offers free sampling as well.
Who issues the permits?
West Lakeland has its own building inspector, and building permits are issued subject to the Town Board's approval. Washington County issues the septic permit, and both the septic permit and the driveway permit have to come before the building permit. New wells go through the Minnesota Department of Health.
Tell us what you have in mind for West Lakeland.
Send the address if you have one. Lori will call you back, and she'll ask a lot of questions before we look at anything.
