Foundation dug, footings prepared.
5855 Oakridge Trail S · Afton MN 55001

May 1. The pad is graded, footings trenched. Driveway cut, materials staged for the foundation crew next week. The shape of the house is in the dirt now, before it ever rises. Standing at the edge of the trench, you can already feel where the front door will sit.
