The land and the site work
Before the house, there's the work to get the lot ready. That means clearing, grading, the driveway, bringing in power, and on a lot without city sewer and water, a well and a septic system. On some lots this is a small part of the budget. On others it's one of the biggest lines, especially with a long driveway or soil that needs a different kind of septic system. Oakridge, the home we're building on five wooded acres in Afton, needed its own well and septic system.
That's why we look at the lot before we talk much about the house. The site work is easier to plan for early than to find out about after the design is done.
The size and shape of the house
Square footage matters, but the shape matters almost as much. A simple footprint with one main roofline costs less to build than the same square footage with more corners and rooflines.
Some things add cost without adding much square footage. A walkout lower level and covered porches are common ones. None of them are bad choices. It just helps to know where the money goes when you're deciding.
Finishes and allowances
Most bids include allowances. An allowance is a set amount for something you haven't picked yet, like cabinets, countertops, tile, lighting or appliances. If what you pick costs more than the allowance, you pay the difference. If it costs less, most contracts give you a credit for the difference.
Low allowances are one of the easiest ways to make a bid look cheaper than it is. When you compare bids, compare the allowances line by line, and ask what each one would actually buy.
Design
Some people come to us with plans from an architect. Others come with a few photos and a list of what they want. Either works. An architect's fee is its own line in the budget, and the design itself decides a large share of what the house costs to build.
You don't need to know what you want before we talk. Working out the design with the budget in front of you is part of the process, so you can see what each choice does to the number while it's still easy to change.
How the builder charges
Builders usually work one of two ways. With a fixed price, you agree on one number for a set of plans and specifications, and changes get priced as they come up. With cost-plus, you pay what the work actually costs plus the builder's fee, and you see the invoices.
Each way has trade-offs for you and for the builder. Whichever builder you talk to, ask which way they work, what their fee covers, and how changes get priced before you sign.
Why two bids for the same house can be far apart
When two bids for the same plans are far apart, it's usually because they don't include the same things. These are the places to look.
- Allowances set at different amounts for the same items
- Site work, the well or the septic left out or estimated low
- Design or engineering fees not included
- Permits, utility hookups or landscaping left for later
Ask each builder for a list of what's not included, and read it before you compare totals.
The bank will want a real number too
Most custom homes are built with a construction loan that turns into a regular mortgage when the house is done. The lender wants a detailed budget before it will lend, so a realistic number early helps with the bank as well as with your own planning.
How to get your number
Tell us about your lot, or where you're looking, and what you're picturing. We ask a lot of questions on the first call. From there we can give you a realistic range and tell you what it depends on. You don't need a lot or a plan yet.
Start with your lot and your list
We'll call you back and ask about the land, the house you're picturing, your budget and when you'd like to move in. You'll come away with a range and a clear idea of what drives it.