Week 12

Wall framing

5855 Oakridge Trail S · Afton MN 55001

New wall framing at Oakridge on the concrete slab in early July.

Wall framing was underway by the Fourth of July. The exterior walls and the main interior walls were standing on the slab. Door and window openings were framed at their final locations.