Skip to content
Heritage Homes
Week 10

Concrete slab

5855 Oakridge Trail S · Afton MN 55001

The poured concrete slab at Oakridge in June, with the safe room in the background.

The concrete slab was poured before the end of June. The lines set during under-slab preparation now extend up through the floor at their planned locations. Wall framing begins next.

The finished Oakridge slab from above in late June.
Build updates by email

Follow the Oakridge build by email.

Heritage Homes sends one short email when a new journal entry is published. You confirm your address first, and every email has an unsubscribe link.

CallText