Week 6

Foundation complete

5855 Oakridge Trail S · Afton MN 55001

The completed Oakridge foundation, backfilled and leveled, with woods surrounding the site.

The foundation was complete by Memorial Day. Soil was backfilled around the exterior walls, and the area inside the walls was filled and leveled. The next stage is preparation for the concrete floor.