Build in Stillwater

Custom homes for Stillwater landowners.

If you own a lot in Stillwater, on the bluff above the river or in the historic neighborhoods west of Main, we'll design a home for it.

Building in Stillwater

New construction in an old river town.

Stillwater has the river, a downtown full of old brick buildings, and neighborhoods where many of the houses are more than a hundred years old.

A lot of people love those neighborhoods but don't want an old house's problems, like drafty windows and old wiring. We design new homes that fit in on those streets. If your lot needs design review, it's part of the plan from the first drawing.

Building on an older street is different from building on open land. The houses next door matter almost as much as the lot does, and the city looks at how a new house sits among them.

Before you design

What we check first on a Stillwater lot.

These come from Stillwater's city code and the Brown's Creek Watershed District rules. Stillwater renumbered its zoning code in 2023 and amended its residential districts in January 2026, so we confirm each rule with the city for your lot.

  • Design review

    Building a new house on a vacant lot in Stillwater's Neighborhood Conservation District triggers design review. The guidelines look at the size and massing of the house, the rhythm of the houses along the street, roof forms and height, how big the house is compared to the lot, where the garage goes, and the facade and materials. Downtown, the Heritage Preservation Commission reviews single-family homes directly.

  • The commission's calendar

    The Heritage Preservation Commission meets once a month, usually on the third Wednesday, and applications are due about a month before the meeting. That adds four to six weeks before the building permit, and more if the commission asks for changes. We submit a complete application so it makes the earliest agenda we can get.

  • Lot size and setbacks

    In the RA district, a single-family lot needs 10,000 square feet and 75 feet of width. The house sits 30 feet from the front, 10 feet from the sides and 25 feet from the rear, and can cover no more than 30 percent of the lot. RB lots can be as small as 7,500 square feet and 50 feet wide. Older lots don't always meet today's minimums, so we check what the city allows on yours.

  • Lots near the river

    Lots in the St. Croix riverway have to keep the house 40 feet back from the bluffline and 100 feet from the river's high-water line. Nothing can be built on slopes over 12 percent, hard surfaces are capped at 20 percent of the lot, and the exterior has to be earth or summer vegetation tones unless the house is screened from the river.

  • Trees

    Stillwater requires a tree protection plan when significant trees stand within 15 feet of construction. Trees that come down get replaced on the lot or paid for with a fee. On an older lot with big trees, this can decide where the garage and driveway go.

  • Brown's Creek watershed

    Lots in the Brown's Creek Watershed District need a district erosion permit when the work disturbs more than 5,000 square feet or moves more than 50 cubic yards of earth, which a new house often does. A home site in a subdivision the district already permitted is exempt. District staff approve single-home permits.

How it goes

Five steps from the lot you own to the home you'll live in.

Most of the decisions that matter happen in the first few months, before anything is built. That's also when budgets usually drift, because changes look small on paper. We price each one as it comes up, so you know what the home costs before construction starts. The build itself takes about ten to twelve months.

  1. 01

    Lot evaluation

    2-3 weeks

    We find out whether the lot is in a design review district or the riverway. Then we walk it with you and look at the houses on either side, because on an older street they shape the design almost as much as the lot does.

  2. 02

    Soil, perc, setback

    3-4 weeks

    A lot on city sewer doesn't need a perc test. The survey matters more here, because older lots can have odd dimensions, and lots near the river need the bluffline marked.

  3. 03

    Design for the lot

    6-8 weeks

    If the lot needs design review, the guidelines are part of the first drawing. That's where the porch, the roofline and the garage placement get worked out. You make the calls, inside what the guidelines allow.

  4. 04

    Permitting

    4-8 weeks (varies)

    Design review comes first, at the Heritage Preservation Commission's monthly meeting, and then the building permit. We prepare and submit both, and we tell you when each meeting is.

  5. 05

    Build

    10-12 months

    Building on a tight street takes planning for deliveries, parking and the neighbors from the first day. The same person runs your build from groundwork to move-in, and you get a written update every week.

What we get asked

What Stillwater lot owners ask us.

  • What about design review in Stillwater?

    If your lot is in the Neighborhood Conservation District or downtown, the design has to pass the city's design review before the building permit. It's manageable when the design starts with the guidelines instead of adding them at the end. We pull the guidelines for your block, draw within them, and submit for you.

  • Can I tear down an old house and build new?

    It depends on the house. In the Neighborhood Conservation District, demolishing more than 20 percent of the street-facing walls of a house built before 1946 triggers design review. We check the house's age and the district rules before you plan on a teardown.

  • Will a new house look out of place on an old street?

    It shouldn't, if it's designed for the street. Most of the guidelines are about proportion: how tall the house is, how wide it looks from the sidewalk, the shape of the roof, and where the garage sits. A new house can follow all of that and still have new windows, wiring and insulation inside. That's why a lot of people build new here.

How the money works

How financing works when you already own the lot.

Most people building on their own Stillwater lot use a construction-to-permanent loan. There's one closing, and during the build you pay interest only on what's been drawn. If the lot is paid off, its value usually counts toward the down payment.

Lenders need final plans to appraise a house that isn't built yet, and in Stillwater final plans can include design review. We build those weeks into the timeline you see at the start.

How construction-to-permanent loans work →
Oakridge live

The first Heritage build, week by week.

Oakridge is our first home, on five wooded acres in Afton. It's a single-level house, built slab-on-grade with a safe room. We document it stage by stage so you can see how we build, including the parts that end up behind the walls.

Week 30 · latest entry

Stucco

The front of the house at Oakridge in November, with the stucco finished and the scaffolding down.

The first coat of stucco on the front of the house is finished, and the scaffolding is finally down. The final coat will wait until spring to have the best results and finish off this incredible house.

Start the conversation

Tell us about your Stillwater lot.

Tell us where your lot is and what you have in mind. We'll call you back, ask a lot of questions, and walk you through what building on your lot involves. You don't need plans or a budget figured out first. Or call (651) 383-1710.